FCC Part 20 & Part 90NFPA 72 / IFC 510 ERRCSLicensed low-voltage & insured
Mon–Fri 7a–6p CTFree RF site survey
Support · Required every year by code
IFC 510 and NFPA 72 require public safety radio systems to be tested annually. Miss it and the building is out of compliance — often discovered during an unrelated inspection.

Frequency
Annual, code required
Scope
Full grid test, all divisions
Battery test
Capacity under load
Filing
AHJ documentation included
Straight answers
A renewal date, a property transfer, or a fire inspection that asked for last year's test record.
No gated pricing, no “contact us for a quote” on the basics. Every number below is the range we actually quote in commercial buildings; your survey replaces it with a fixed figure.
Code requires installed public safety radio systems to be re-tested every year: a full grid test across every division of the building, battery capacity under load, annunciator and supervisory circuit checks, and enclosure/antenna inspection — with the results filed with the AHJ.
The building owner. A lapse typically surfaces during an unrelated fire inspection, and it can put occupancy or an insurance position at risk.
Priced per building by size and number of test divisions, with portfolio pricing and a single consolidated renewal date available across multiple properties.
This is the right scope if
We’ll point you elsewhere if
What this covers
Our recertification program re-runs the full grid test across every division of the building, verifies battery capacity under load, checks annunciator and supervisory circuits, inspects enclosures and antenna terminations, and files the documentation with the AHJ.
Where the building has changed — new walls, new tenant build-outs, a new addition — we flag the coverage impact and scope the correction rather than filing a marginal pass.
Programs are available per building or across an entire portfolio with a single renewal date and consolidated reporting.
Deliverables
Best fit for
How we deliver it
01
Schedule with AHJ
Book the annual inspection window before your certificate lapses.
02
System inspection
Battery load test, enclosure integrity, annunciator function and alarm pathway.
03
Grid re-test
Full delivered audio quality test against the current adopted code edition.
04
Filed documentation
Signed report submitted to the fire marshal and archived in your building file.
Scope of work
Included
Not included
Codes & standards
FCC Part 20
Consumer/industrial signal booster certification and carrier consent.
FCC Part 90
Part 90 Class A/B signal boosters for public safety spectrum.
NFPA 72 / 1225
Emergency responder communication enhancement system requirements.
IFC 510
In-building emergency responder radio coverage, adopted by your AHJ.
NEC / NFPA 70
Low-voltage pathway, plenum cabling and grounding requirements.
Investment
Single site annual
From $1,800
Scaled to grid count
Portfolio contract
Volume rate
Consolidated schedule and reporting
Battery replacement cycle
Every 3–5 years
Tracked for you
Ranges reflect turnkey commercial work in our markets. Your survey returns a fixed-price number, not a range.
Platforms
Platform-neutral — we spec whatever the RF budget calls for.
Where we deliver it
Engineered and dispatched from our Houston office. Multi-site portfolios handled nationwide.
Answers
The building owner. The AHJ enforces it, and a lapse can surface during any fire inspection.
Yes. We benchmark the existing system first and tell you plainly whether it will pass before the official test.
Compliance
Public Safety ERRCS / BDA Systems
NFPA 72 and IFC 510 emergency responder radio coverage engineered for AHJ sign-off.
View service
Support
DAS Service, Repair & Upgrades
Troubleshooting, expansion and modernization of existing in-building systems.
View service
Design
Multi-Site & Portfolio Rollouts
Standardized coverage programs across many buildings, cities and states.
View service
Send the building details and we return a scoped estimate in two business days.